Questions or Concerns Regarding this Work:

Tony Holt: Utility Services Manager, 812-488-2730, th22@evansville.edu

Affected Date and Time:

Tuesday, August 5, 4:00 AM through 12:00 PM

Description of Work:

Due to multiple CenterPoint transformer outages and line repairs, an electrical utility shutdown is necessary to install new transformers and electrical lines that feed multiple campus buildings.

Buildings Affected

-General Services

-McCutchan Stadium

-James and Dorthy Cooper Stadium

-ESPN Trailer

-Braun Stadium

-Schroeder Hall

Impact for Occupants:

-There will be no electrical utility power for the duration of the shutdown (emergency generator power for Public Safety will still be available).

-There may be areas within the building(s) that will not have heating or air conditioning.

Action(s) Required:

-As a precaution, turn off all computers and all other sensitive equipment prior to the electrical shutdown time.

-Keep refrigerators closed to ensure appropriate inside refrigerator temperature for food freshness/safety

-Please follow posted signage, caution tape and cones.

-Use caution near equipment and repair activity.

Thank you for your patience as we maintain our beautiful campus

To report a facilities emergency, call (812) 488-2775