Questions or Concerns Regarding this Work:
Tony Holt: Utility Services Manager, 812-488-2730, th22@evansville.edu
Affected Date and Time:
Tuesday, August 5, 4:00 AM through 12:00 PM
Description of Work:
Due to multiple CenterPoint transformer outages and line repairs, an electrical utility shutdown is necessary to install new transformers and electrical lines that feed multiple campus buildings.
Buildings Affected
-General Services
-McCutchan Stadium
-James and Dorthy Cooper Stadium
-ESPN Trailer
-Braun Stadium
-Schroeder Hall
Impact for Occupants:
-There will be no electrical utility power for the duration of the shutdown (emergency generator power for Public Safety will still be available).
-There may be areas within the building(s) that will not have heating or air conditioning.
Action(s) Required:
-As a precaution, turn off all computers and all other sensitive equipment prior to the electrical shutdown time.
-Keep refrigerators closed to ensure appropriate inside refrigerator temperature for food freshness/safety
-Please follow posted signage, caution tape and cones.
-Use caution near equipment and repair activity.
Thank you for your patience as we maintain our beautiful campus
To report a facilities emergency, call (812) 488-2775 |